Notorious bends on the road into Dingle were “not just
impediments on the way” but were rare geomorphological features, a Bord
Pleanála hearing into plans to straighten the N86 secondary road heard. Sarah
Dolan, representing a group of local residents, said the scale of the planned
new Dingle-Camp road was “three times the size of the current road”, which the
hearing was told dated to the 18th century.
Read the article @ The Irish Times
No comments:
Post a Comment
Note: only a member of this blog may post a comment.