This site is maintained by Brendan Buck, a qualified, experienced and Irish Planning Institute accredited town planner. If you need to consult a planner visit: https://bpsplanning.ie/, email: info@bpsplanning.ie or phone: 01-5394960 / 087-2615871.
Wednesday, 13 May 2009
Samuel Beckett Bridge
It is planned that the East Link Toll Bridge will be lifted between 2pm and 3.30pm this afternoon, to allow the new Samuel Beckett Bridge to be moved. Gardaí will direct traffic for the duration of the closure.
No comments:
Post a Comment