This site is maintained by Brendan Buck, a qualified, experienced and Irish Planning Institute accredited town planner. If you need to consult a planner visit: https://bpsplanning.ie/, email: info@bpsplanning.ie or phone: 01-5394960 / 087-2615871.
Thursday, 29 March 2018
Hundreds of boom-builds are unsafe, say experts
Hundreds of apartment blocks built during the boom around the country could be as dangerous as Priory Hall, fire safety experts have warned. Many apartment complexes share the same problems identified in the Tom McFeely-built block of apartments in north Dublin. And fire safety inspectors who have been called to examine blocks say owners and management companies are "burying their heads in the sand" over the dangers. One expert in the area of fire safety said last week that not only were residential buildings potentially dangerous, but so too were schools, healthcare premises and office buildings that went up in the boom era. When asked to give an estimate of the number of potentially fire-hazardous buildings that were built during the time, the expert told the Sunday Independent: "No one knows, but hundreds, certainly hundreds."
Read the full article @ The Irish Independent
Our fire safety certification process will not protect against another Grenfell
Read the full article @ The Irish Times
Sunday, 12 November 2006
The role of building control within Irish planning
The role of building control within Irish planning
Building regulations have a long colourful history, dating back to the 1878 Public Health (
The regulations comprise a set of legal requirements, expressed in simple functional statements. They address: Structure; fire safety; site preparation and resistance to moisture; sound; ventilation; Hygiene; Drainage and waste water disposal; heat producing appliances; stairways, ladders, ramps and guards; Conservation of fuel and energy; and, Access for people with disabilities. They go from Part A to Part M and are clearly exciting stuff. They are 12 separate technical documents.
All construction work must comply with the regulations. The responsibility for compliance rests with designers, builders and building owners. Building control authorities have powers to inspect design documents and buildings as well as powers of enforcement and prosecution where breaches of the regulations occur. There are heavy fines and imprisonment penalties. Selling a property can be difficult if a purchaser’s solicitor finds out the building does not comply with the regulations.
There are two important control arrangements in the system:
Firstly, Commencement Notices: these notify a building control authority that a person intends to carry out either works or a material change of use to which the building regulations apply. This notice must be given to the authority not more than 28 days and not less than 14 days before commencement. A fee is payable with the notice. Its size depends on the number of buildings. They are required for: (1) erecting ad building, (2) a material alteration or extension of a building, (3) a material change of use of a building or works in connection with this change. Exempted development under the planning code does not require a notice.
Secondly, a Fire Safety Certificate: this is a certificate granted by a building control authority which certifies that if a building or works is constructed in accordance with plans submitted, it would comply with the regulations (part B – fire safety). With few exemptions (agricultural buildings and houses), one is required for all new buildings (including flats and apartments), as well as material changes of use and certain alterations and extensions to buildings. It must be obtained before work starts. A fee is required and there is an application procedure. It takes two months but this can be extended on written agreement, e.g. if more information is required. An appeal to the Board is possible within one month if refused.
