Irish Planning History: From No System to Compulsory Permission

Most people who deal with Irish planning meet it first as a prohibition. You may not develop land, save under and in accordance with a permission. That rule, now so familiar that it feels like weather, is younger than many practising planners. It took statutory form in the Local Government (Planning and Development) Act 1963, and it began to bind the country on 1 October 1964. The question this piece tries to answer is how Ireland moved, in a little over two centuries, from a world in which almost nobody needed the State's leave to build, to one in which nearly every material change on land does. The arc is not a smooth progress from darkness into light. It is a story of private estates and a Georgian street commission, of Victorian sanitary law, of a civic whirlwind that never became a statute, of an adoptive Act that almost nobody finished using, and finally of a mandatory system that was, by design, far more controlling than anything that had gone before.

What existed before a planning system

Ireland did not wait for a Planning Act to shape its towns. In Dublin the most famous pre-statutory instrument was the Wide Streets Commission, established by Act of Parliament in 1757 as the Commissioners for Making Wide and Convenient Ways, Streets and Passages in the City of Dublin. Dublin City Archives still hold its minutes, maps and architectural drawings. The Commission could acquire property by compulsory purchase, demolish it, lay out new streets and lease building lots to developers. It created Parliament Street, widened Dame Street, built Carlisle Bridge (now O'Connell Bridge), and laid out Westmoreland Street and D'Olier Street. It also regulated façades along the new lines: height, terrace rhythm, materials and the spacing of windows. Doors and fanlights were left freer, which is why Georgian Dublin can look uniform from a distance and individual up close. After the Union the Commission's money dried up; it was abolished under the Dublin Improvement Act 1849 and its powers passed to the municipal corporation from 1851. Parallel to that public machinery ran the private planning of the great estates, Gardiner and Fitzwilliam among them, which fixed so much of the city's street pattern without any modern development plan.

Nineteenth-century statute law then gave local authorities sanitary and housing powers rather than a general right to say yes or no to development. The Housing of the Working Classes Acts allowed clearance of unhealthy areas and the provision of dwellings. What Ireland did not get was Britain's first general town-planning statute. The Housing, Town Planning, &c. Act 1909 empowered English and Scottish authorities to make town-planning schemes, then ended with a short exclusion that still surprises students: "This Act shall not extend to Ireland." Michael J. Bannon's account of the genesis of modern Irish planning puts the exclusion in its legislative context: the planning clauses rode on a housing Bill that was broadly similar to the Housing of the Working Classes (Ireland) Act 1908, so Ireland was left out (Bannon, p. 191). The planning ideal nonetheless crossed the Irish Sea. Bannon records that a "vibrant and promising town-planning movement" existed in Dublin until 1916 (Bannon, p. 191). When Irish reformers spoke of town planning in the 1910s, they were arguing for a power their neighbours already had and they did not.

The gap: Geddes, the H.T.P.A.I. and a city without a statute

That gap is where the story thickens. Late nineteenth-century Ireland had seen gradual improvement in urban sanitary law, municipal reform and working-class housing, but Bannon's verdict is that it remained "piecemeal and largely unco-ordinated" and "devoid of any overall organising plan" (Bannon, p. 191). Dublin's death rates stayed high; typhoid epidemics marked the 1880s and 1890s; among the labouring classes some two-fifths of deaths were of children under five (Bannon, pp. 191–192). At the turn of the century at least 20,000 Dublin families still occupied one-room tenements, and voluntary and artisan-dwelling companies could not build enough houses at rents the average workman could pay (Bannon, p. 192). Planning, when it arrived as an idea, was still almost exclusively a way of talking about the housing question (Bannon, p. 192).

The catalyst was Patrick Geddes. In 1911, at the invitation of the Viceroy and Lady Aberdeen, he brought his Cities and Town Planning Exhibition to Dublin. It opened at the Royal Dublin Society in Ballsbridge from 24 May to 7 June, directed by Geddes with Frank Mears as assistant, and was later re-erected at Trinity College during the Royal Institute of Public Health Congress of 15–21 August (Bannon, pp. 196–197, 200). Attendance at the first showing was put at about 160,000 (Bannon, p. 199). Geddes preached "conservative surgery" of derelict corners and small gardens rather than Haussmannian clearance (Bannon, pp. 199–200). One direct consequence was a campaign, with Nora Geddes and the Women's National Health Association, to turn derelict sites into children's gardens (Bannon, p. 201). The other was institutional: the Housing and Town Planning Association of Ireland (H.T.P.A.I.), formed on 30 September 1911 with its inaugural meeting on 27 November, Lady Aberdeen as president and offices in Ely Place (Bannon, pp. 201–202).

The Association's first object was to educate public opinion. A Cork branch followed in February 1913. It urged civic surveys in the Geddesian manner - maps, air photographs, relief models, traffic diagrams - and pressed municipalities by persuasion because the 1909 Act gave them no planning power (Bannon, pp. 203–204). Lectures ran through Belfast, Cork and Dublin. In the spring of 1914 John Nolen and Raymond Unwin spoke on the replanning of Dublin; Unwin urged the city to plan "on a grand scale" and "as though no private interests were involved" (Bannon, pp. 205–206). An H.T.P.A.I. conference at the R.D.S. on 23 October 1912 resolved that urban authorities face "the urgent problems of housing and the economic planning of urban and other areas throughout Ireland" (Bannon, p. 206).

Then came the shock that made the argument concrete. In 1913 the collapse of a Dublin slum street helped force a Departmental Committee of Inquiry into housing conditions. The figures Bannon draws from it are still hard to read lightly: in 1911 some 22.9 per cent of Dublin's population lived in one-roomed tenements; by 1913 there were 518 "third-class" tenements unfit for human habitation, holding 6,831 families (22,701 persons), with tens of thousands more in only marginally better "second-class" rooms; roughly 60,000 people needed rehousing (Bannon, p. 207). The committee favoured suburban building on "virgin soil" on the outskirts rather than reoccupation of the old streets (Bannon, p. 208). E.A. Aston, a founder of the H.T.P.A.I., told the inquiry that Dublin lacked a "general plan of city development" and proposed a joint housing authority for city, townships and county, with a civic survey of "the whole natural community of Dublin" (Bannon, p. 209). Geddes gave evidence for the Women's National Health Association; he condemned segregated rows of two-roomed dwellings as future slums, praised small open spaces over grandiose parks, and argued that many necessary improvements required "an extension of powers by means of an improved Town Planning Act" (Bannon, pp. 210–212). J.F. McCabe of the Local Government Board, in a memorandum that The Irish Builder and Engineer applauded, insisted that building before a civic survey and town plan was a "grave misfortune" (Bannon, p. 213).

Momentum, not statute, followed. In January 1914 the Aberdeens and the H.T.P.A.I. launched a Civic Exhibition and an international competition for a plan of Greater Dublin. The exhibition ran for six weeks from 15 July to 31 August 1914 at the Linenhall Buildings and the grounds of the King's Inns; opening day saw some 9,000 visitors; Abercrombie later recalled that he had "never seen anything more remarkable in all my life," while The Irish Worker dismissed it as "Lady Microbe's Civic Farce" (Bannon, p. 216). A broadly based Civic Exhibition Committee drew in the H.T.P.A.I., the R.I.A.I., the engineers, the Chamber of Commerce and others; Geddes was the prime mover and Nolen the manager (Bannon, p. 215). From that committee grew the Civics Institute of Ireland, which on 30 June 1916 formally took over the H.T.P.A.I.'s functions and remained active for almost thirty years (Bannon, p. 215). Among the Institute's later achievements Bannon lists the Dublin of the Future competition, civic surveys of Dublin and Cork, housing weeks and conferences - and, with the R.I.A.I., the promotion of a Town Planning and Rural Amenities Bill in the Senate (Bannon, p. 215).

On 10 August 1914, on the Lord Mayor's proposal, Dublin Corporation voted 27 to 8 to have Patrick Geddes and Raymond Unwin review its central clearance schemes at Beresford Street, Church Street, Ormond Market and Trinity Ward (Bannon, p. 221). Their report, sent from Hampstead on 26 September, pressed lower densities, play space and garden-suburb solutions, including Marino (Bannon, pp. 222–224). On 5 October Councillor W.T. Cosgrave moved that the schemes proceed as planned, and Bannon's judgment is that the report had little effect on them (Bannon, p. 226). The competition itself, with a £500 prize given by the Marquis of Aberdeen and Temair, asked for a Greater Dublin plan taking in Howth, Glasnevin, Ashtown, Dundrum and Dalkey, and for proposals to house the Inquiry's 14,000 new dwellings alongside communications and metropolitan improvements. War delayed adjudication until 1916. The prize went to Patrick Abercrombie with Sydney and Arthur Kelly. Thomas Adams wrote a separate assessment of the entries. The winning scheme was published in 1922 as Dublin of the Future.

Abercrombie's Irish Act, and a false dawn

What matters for the legislative story is that Abercrombie and his partners already saw the need for Irish statute, and that they did not want a carbon copy of the 1909 Act. In the published report they sketch a Housing and Town Planning Act for the whole country, built around a central Town Planning Commission and local boards preparing schemes for Parliament - "more a Commission on Town Planning" than the English model, because "the relative conditions are not the same." "Indeed if it is the first act of legislation which proceeds from her newly-formed Parliament," they wrote, "it will be a fitting opening to an honourable career." Bannon's reading of that call, and of the surrounding debate, places it at the heart of the pre-independence agenda (Bannon, pp. 239–240). Adams, for his part, pressed the case for a Greater Dublin Planning Commission (Bannon, pp. 239–240). The Institute's foreword to Dublin of the Future is touching in its hopes: with the recent change in national circumstances a new epoch had begun, and this was "a most opportune time to arouse the interest of the Citizens". The adjudicators, Geddes, Charles McCarthy and John Nolen, had taken care not to endorse every proposal. The authors themselves treated the plan as a starting point and a quarry of ideas rather than a finished ordinance.

It was not the first Act of the new State. Bannon's verdict on the whole pre-1916 "whirlwind of planning promotion" is that it was a false dawn, and that the results in the new State were "limited and long delayed" (Bannon, pp. 241–242). For more than a decade the Free State managed without a general planning system. The Civics Institute kept at it: civic surveys in the mid-1920s, housing weeks, and that Senate Bill with the R.I.A.I. (Bannon, p. 215). Later Abercrombie, with Manning Robertson and the Kellys, prepared a sketch development plan for Dublin; Neil Blaney, introducing the 1962 Bill in the Dáil, dated that sketch to 1939 and said the Corporation's later planning scheme was based on it. The civic ideal was clear. The legal machinery was not yet there.

The adoptive Act of 1934

The Town and Regional Planning Act 1934, enacted on 29 May 1934, was Ireland's first general planning statute. Its long title promised "the orderly and progressive development of cities, towns, and other areas, whether urban or rural" and the preservation and improvement of amenities. Section 17 made every county borough, borough, urban district and county health district a planning district, with the relevant council as planning authority. The decisive feature was that the Act was adoptive. Under section 26 a planning authority could, by a specially notified resolution passed by more than half its members, decide to make a planning scheme for its district or part of it. Once that resolution was passed, the authority could not lawfully revoke it, and interim control began.

That interim control is the hinge of the whole story. Section 57 allowed the authority, after the resolution and before any scheme came into operation, to grant permissions for the construction, demolition, alteration or extension of structures, to attach conditions, and to prohibit work already under way. If it failed to decide a permission application within two months, the application was deemed granted. Section 59 gave any person aggrieved by a grant, refusal or prohibition a right of appeal to the Minister. Compensation for interim restrictions was, in the main, postponed until a scheme was in force. The Town and Regional Planning (Amendment) Act 1939, enacted on 31 May 1939, tried to ease some of the rigidities: it dealt with road plans, density units, special prohibitions and appeals, and sought to relieve authorities of the obligation to plan their entire area in one go. It did not change the adoptive character of the legislation.

Control without a plan

By the early 1960s the results were plain enough to be recited in the Dáil. On 31 January 1963 the Minister's Department told the House that 4,037 valid appeals had been made under section 59 of the 1934 Act: 790 allowed, 435 allowed subject to conditions, 1,425 disallowed and 1,030 withdrawn. A long list of authorities had passed resolutions to make schemes. Exactly one, Dublin Corporation, had ever submitted a scheme for approval. And because no planning scheme had been brought into operation anywhere, no application under the enforcement provisions that depended on an operative scheme could even be made. Irish people were already living under interim planning control, seeking permission and appealing refusals, without a finished plan to tell them what the rules were meant to secure.

When Neil Blaney moved the Second Stage of the Local Government (Planning and Development) Bill, 1962, in the Dáil on 22 November 1962, and again in the Seanad on 31 July 1963, he made no effort to defend that record. The 1934 and 1939 Acts, he said, were adoptive; their procedures were "so lengthy and cumbersome that local authorities were deterred from producing comprehensive planning schemes"; only Dublin had prepared a scheme, and even that had not come into force because of defects that "stemmed from inherent weaknesses in the enabling legislation". "Probably the greatest defect of the Acts," he told the Seanad, "was that they failed to stimulate a positive approach to planning." Compensation was tangled up with the coming into force of a scheme; betterment had proved almost impossible to collect (he cited the English experience of only three recorded instances under similar provisions); and the powers were "largely regulatory" when what cities now needed was the ability to assemble land and renew obsolete centres. He was also frank that interim control, intended as a short bridge to a scheme, had become the permanent weather of the system.

The 1963 Act: obligation, definition, permission

The Local Government (Planning and Development) Act 1963, signed on 7 August 1963, repealed the 1934 and 1939 Acts and replaced them with legislation whose long title still sets the tone of Irish planning: provision "in the interests of the common good" for the proper planning and development of cities, towns and other areas. S.I. No. 211/1964 appointed 1 October 1964 as the appointed day. From that date, subject to limited exceptions for building-regulation sections, the new system applied.

Three features made it controlling in a way the 1934 Act never was.

First, the development plan became an obligation. Section 19 required every planning authority, within three years of the appointed day (or such longer period as the Minister might allow), to make a plan indicating development objectives for their area. The plan was to be a written statement and a plan. For cities and towns the minimum objectives included zoning of land for particular purposes, road safety and parking, renewal of obsolete areas, and the preservation and improvement of amenities. For other areas the minima were renewal, amenity, and water and sewerage. Making the plan was a reserved function of the elected members. The Minister's approval of each plan was deliberately dropped; Blaney wanted the Department free to advise rather than to confirm.

Second, "development" was defined widely. Section 3 made it the carrying out of any works on, in or under land, or the making of any material change in the use of any structures or other land. Use of land for advertisements, caravanning, camping, storage of caravans or the deposit of waste was deemed a material change. So was the use as two or more dwellings of a structure previously used as a single dwelling. The 1934 interim regime had controlled structures; the 1963 Act reached use as well. Blaney told the Dáil that the omission of use control in the interim period had been an anomaly born of the hope that schemes would arrive quickly. They had not, and "much harm" had been done.

Third, permission became the general rule. Section 24 is the clause every planner still carries in their head: subject to the Act, permission is required for any development of land that is neither exempted development nor commenced before the appointed day, and for the retention of structures that were unauthorised on that day. A person shall not carry out such development save under and in accordance with a permission. Contravention was a summary offence. Section 26 then set the criteria for deciding applications: the planning authority was restricted to considering the proper planning and development of its area, including amenities, regard being had to the development plan and to any special amenity area order. Reasons had to be stated for refusals and conditions. Any person could appeal to the Minister. Outline permission, public notice of applications, and a public register of decisions were contemplated in the permission regulations. Enforcement notices, tree preservation and conservation orders, special amenity area orders, and positive powers to acquire and redevelop land for urban renewal completed a machinery that was no longer waiting for an optional scheme.

Compensation was reworked so that claims followed individual refusals or conditions rather than the coming into force of a rigid scheme, and betterment charges of the old kind were effectively abandoned. "Property carries obligations as well as rights," Blaney told the Seanad, pointing to the Constitution's delimitation of private property by law. The phrase has been quoted ever since, sometimes as a threat and sometimes as a defence. In context it was the Minister's answer to why a State that had spent a generation giving farmers freehold title through the land acts was now asserting a general veto over the use of land.

Why it felt, and was, so controlling

The jump from 1934 to 1963 is easy to misread as a simple modernisation. It was more than that. The old Act invited councils to enter planning; the new Act required them to. The old Act controlled buildings in the interim and postponed most of the hard reckoning until a scheme arrived that almost never did; the new Act made permission the ordinary condition of development from day one, for works and for material changes of use, across the State. Appeals stayed with the Minister, so the centre of the system remained political for another thirteen years until An Bord Pleanála was created. Positive powers of land assembly for urban renewal, which Blaney had studied in North America, sat beside amenity controls designed for a growing tourist economy. The model owed much to British post-war planning legislation, even though Irish land politics were not the same - and even though Abercrombie, half a century earlier, had already warned against copying the 1909 Act.

Looked at across the longer arc, the 1963 Act is also the delayed answer to the false dawn Bannon describes. Between 1911 and 1916 Dublin had exhibitions, an association, an inquiry, a civic week, a competition and a published plan calling for an Irish Act with a central commission. What it did not get was the Act. What it got, after another generation of adoptive half-measures, was a system that did not wait to be invited in. Senator James Dooge, welcoming the Bill in the Seanad, put his finger on the problem the statute could not solve. The 1934 Act had failed not only procedurally but "in regard to public opinion": "There was a lack of involvement and a lack of participation on the part of the public." His remedy remains the best short summary of what the 1963 Act could create and what it could not: "There must be found a way in which there will be a public sanction for planning." The Oireachtas could, and did, make development without permission an offence. It could not legislate the consent underneath. That is why the system that began on 1 October 1964 still feels, to applicants and objectors alike, like a controlling system: because that is exactly what its authors set out to build, after fifty years in which a civic campaign and then a gentler, adoptive Act had planned and controlled without ever quite closing the circle from idea to binding law.

Further reading

M.J. Bannon (ed.), The Emergence of Irish Planning, 1880–1920 (Turoe Press, Dublin, 1985), especially Michael J. Bannon, "The Genesis of Modern Irish Planning," pp. 189–262: NLI catalogue (https://catalogue.nli.ie/Record/vtls000119269)

Town and Regional Planning Act, 1934 (https://www.irishstatutebook.ie/eli/1934/act/22/enacted/en/html) (No. 22 of 1934)

Town and Regional Planning (Amendment) Act, 1939 (https://www.irishstatutebook.ie/eli/1939/act/11/enacted/en/html) (No. 11 of 1939)

Local Government (Planning and Development) Act, 1963 (https://www.irishstatutebook.ie/eli/1963/act/28/enacted/en/html) (No. 28 of 1963)

Local Government (Planning and Development) Act, 1963, (Appointed Day) Order, 1964 (https://www.irishstatutebook.ie/eli/1964/si/211/made/en/html) (S.I. No. 211/1964)

Housing, Town Planning, &c. Act, 1909 (https://www.irishstatutebook.ie/eli/1909/act/44/enacted/en/print.html) (note s.76: "This Act shall not extend to Ireland.")

Dáil Éireann, Local Government (Planning and Development) Bill, 1962 - Second Stage (https://www.oireachtas.ie/en/debates/debate/dail/1962-11-22/113/), 22 November 1962 (Neil Blaney)

Seanad Éireann, Local Government (Planning and Development) Bill, 1962 - Second Stage (https://www.oireachtas.ie/en/debates/debate/seanad/1963-07-31/6/), 31 July 1963 (Blaney; James Dooge)

Dáil Éireann, Oral Answers - Town Planning (https://www.oireachtas.ie/en/debates/debate/dail/1963-01-31/24/), 31 January 1963 (appeals and planning resolutions under the 1934 Act)

Dublin of the Future (https://centuryireland.rte.ie/centuryireland/images/uploads/further-reading/Ed92-DublinOfTheFuture1.pdf), Patrick Abercrombie, Sydney Kelly and Arthur Kelly (Civics Institute of Ireland, 1922)

Wide Streets Commission (https://iar.ie/archive/wide-streets-commission/) archive description, Dublin City Archives

Planning: The Irish Experience 1920–1988, edited by Michael J. Bannon (Wolfhound Press, 1989), including Kevin Nowlan, "The Evolution of Irish Planning, 1934–1964": NLI catalogue (https://catalogue.nli.ie/Record/vtls000087776)

Irish Planning Law Roundup, 11 November 2026

This is an editorial from BPS Planning, issued for discussion only. It is not legal advice.

A fuller week than the last. The Supreme Court has given a significant judgment on how far an environmental assessment must follow the by-products of a project off site, and the High Court has dealt with three procedural questions that matter more to day-to-day practice than they might first appear: when time runs against a statutory consultee, whether an applicant can test a decision-maker's evidence by cross-examination, and what happens to an enforcement challenge left dormant for four years. Two of the High Court judgments concern site investigation surveys for the Codling offshore wind farm off the Wicklow coast.

Supreme Court: a poultry licence did not have to assess where the manure might end up

Sweetman v The Environmental Protection Agency, Ireland and the Attorney General [2026] IESC 48 (https://judgments.courts.ie/judgments/44759) (Michael Noel O'Connor, notice party). Supreme Court (O'Donnell CJ, O'Malley, Woulfe, Hogan and Donnelly JJ), judgment of Woulfe J delivered on 5 November 2026, with which the other members of the court concurred, and published on 10 November 2026.

The case concerned an industrial emissions licence granted by the Environmental Protection Agency for a broiler unit in County Limerick rearing 74,000 birds, above the 40,000-place licensing threshold. The poultry litter and wash water are rich in nitrates and phosphates. The application said that all of the litter would go to a mushroom compost producer in Gorey, County Wexford, and that wash water would be spread on the applicant's own adjoining land, although a report for 2016 showed that roughly two thirds of the litter that year had gone to farmers for landspreading. The Agency's inspector noted that litter "may also be sent for landspreading", but treated the licence as confined to the installation, with spreading regulated under the Nitrates Regulations. Mr Sweetman argued that landspreading was part of the project, and that the Agency should have assessed it for appropriate assessment, under the Water Framework Directive and as an emission from the activity. The High Court (Bradley J) and the Court of Appeal had both rejected that case.

The Supreme Court dismissed the appeal. It held that the Agency's jurisdiction under the Environmental Protection Agency Act 1992 relates to a specified activity in a particular installation, and that the licence, read as a whole, acknowledged that spreading might happen without authorising or regulating it. On the emissions point, the court did not decide whether litter and wash water were "emissions from the activity", because the inspector had in substance assessed the effects of possible spreading in her environmental impact assessment, which was not challenged. On appropriate assessment, Woulfe J accepted that Article 6(3) of the Habitats Directive has no geographical limit, but drew on the court's earlier cheese factory judgment in An Taisce v An Bord Pleanála and on the UK Supreme Court's Finch judgment. Because the application put all of the litter to composting, any landspreading remained "contingent and speculative"; and because the receiving lands could not be identified until a buyer appeared, he was "satisfied on the facts of this case that it is not an effect which is capable of meaningful assessment." The Water Framework Directive argument failed for the same reason. The court considered, and declined, a reference to the Court of Justice, noting that Advocate General Kokott's Opinion in the pending An Taisce references on the Nitrates Action Programme (C-531/24 and C-895/24) arose in a different context.

What it means for your assessment

The judgment confirms that the scope of the project is set by what the application actually proposes, and that an assessor must look at indirect effects but need not try to assess effects that the evidence does not show are likely or that cannot be meaningfully measured. That cuts both ways for practitioners. For applicants, the application documents carry real weight: here the statement that all litter would go to composting was decisive, so descriptions of where by-products, spoil, digestate or slurry will go should be accurate and should match how the operation actually runs, since an assessment built on an inaccurate description is open to attack on other grounds. For planning authorities and inspectors, the inspector's approach in this case is a useful model: she named the possibility of off-site spreading, gave a high-level view of its effects and the controls that apply to it, and said plainly that the licence did not extend to the receiving lands. Where receiving sites are known, or the spreading is an integral part of what is proposed, the position may be quite different, and the pending Court of Justice ruling on the Nitrates Action Programme may yet shape how farm-level spreading is assessed. The judgment is about likelihood and assessability on particular facts, not a general licence to leave off-site effects out of a screening report.

Ballycar wind farm: a statutory consultee's conduct can be challenged within the time for challenging the final decision

Ballycar Green Energy Ltd v An Coimisiún Pleanála and The Irish Air Navigation Service trading as AirNav Ireland [2026] IEHC 726 (https://judgments.courts.ie/judgments/44743) (Shannon Airport Authority DAC, notice party). High Court (Nolan J), judgment delivered 3 November 2026 (record H.JR.2026.0000958).

The Commission refused permission on 7 May 2026 for a 12-turbine wind farm of around 50 to 54 megawatts at Ballycar in south-east Clare, near Meelick and north-west of Limerick city. The developer says the refusal rested on AirNav's objection that the scheme posed an aviation safety risk to Shannon Airport, and that it could not offer site-specific mitigation because AirNav would not engage with it or share underlying radar data. Alongside its challenge to the Commission's decision, it sought a declaration that AirNav had failed to act consistently with section 15 of the Climate Action and Low Carbon Development Act 2015 and had breached its right to fair procedures. AirNav, a prescribed body rather than a decision-maker, argued that the claim against it was governed by Order 84 and was out of time, since its last submission was made on 11 February 2026, more than three months before proceedings issued.

Nolan J granted leave against AirNav. Requiring an applicant to sue each participant in a live planning process before the decision issued would, he said, produce multiple sets of proceedings; he wrote: "I accept the submission that it would create havoc in the planning list." Relying on Spencer Place, North East Pylon Pressure Campaign and the Ballyboden Uisce Éireann confirmation-letter case, he was "satisfied that the Applicant was entitled to wait until the final decision of the Commission before instituting proceedings." He rejected, for now, AirNav's complaint that the pleadings were deficient, while leaving it free to raise the point at the hearing. This is a leave decision only: the judge said expressly that he had no idea whether the complaint about AirNav's engagement was legitimate.

What it means for your assessment

Statutory consultees and prescribed bodies, including AirNav, Transport Infrastructure Ireland, Uisce Éireann and the Department's nature conservation officials, should assume that how they engage with an application may be examined in court alongside the final decision, and should keep a clear record of what was asked of them and what they provided. For applicants, the practical lesson is to put requests for data or meetings in writing and to bring any refusal to engage to the decision-maker's attention during the process, so that the record shows the issue was raised. For inspectors, where a refusal is likely to turn on a single consultee's objection, it is worth recording whether the applicant had a fair chance to respond to it and whether further information was considered. Whether section 15 of the Climate Act imposes any enforceable duty on a consultee in these circumstances remains to be decided at the full hearing.

Codling wind farm surveys: two refusals of cross-examination, and what they say about the record

Ryan and Ors v Maritime Area Regulatory Authority [2026] IEHC 731 (https://judgments.courts.ie/judgments/44752) and Blue Ireland Coalition CLG v Maritime Area Regulatory Authority and Ors [2026] IEHC 732 (https://judgments.courts.ie/judgments/44753) (Codling Wind Park Limited, notice party in both). High Court (Conlon J), judgments delivered 4 November 2026 and published on 6 November 2026.

Both cases challenge maritime usage licence MUL230034, granted by the Maritime Area Regulatory Authority on 23 February 2026, which allows geophysical and geotechnical surveys over about 477 square kilometres to inform the design of the Codling wind farm on the Codling bank, between 13 and 22 kilometres off the coast between Wicklow Town and Greystones. In Ryan, a group of fishermen argue that the authority never itself decided that environmental impact assessment screening was unnecessary under section 117(5)(a) of the Maritime Area Planning Act 2021, and that the only consideration was by a senior marine advisor without authority to decide. They sought to cross-examine the director who signed the licence. Conlon J refused: the director swore that he made the decision having considered the advisor's report, the licence recitals recorded that the authority had decided screening was not necessary, and the applicants had offered only a bare denial. He held that "the recitals in substance form part of the decision, or are incorporated into the decision."

In Blue Ireland, the applicant challenges the licence on Habitats Directive grounds concerning harbour porpoise, an Annex IV species, and the Rockabill to Dalkey Island SAC. The Natura impact statement calculated that, applying a 5 kilometre effective deterrence range, 31.1 per cent of the SAC could potentially be affected; the developer's ecologist describes that as a precautionary estimate rather than an area affected at any one time. After leave was granted, an ecological expert's report criticising the Annex IV assessment and the Natura impact statement was filed, the developer's expert replied, and the applicant sought a wide-ranging cross-examination. Conlon J accepted that expert evidence may be needed to show a gap in a Habitats Directive assessment, but observed that "reliance by an applicant on evidence which was not before the decision maker should be the exception rather than the rule." He refused the motion because the applicant had not tied the cross-examination to specific pleaded grounds, the issues were fallback arguments that might never arise, and what was sought was roving, though the trial judge may revisit the question. Neither judgment decides whether the licence is valid.

What it means for your assessment

Ryan is a reminder that the paper trail of who decided what matters. Where an officer's or advisor's report recommends a screening conclusion and a more senior person decides, the decision document should say that the decision-maker considered the report and adopted the conclusion, and should record the screening determination itself; here the recitals and the director's affidavit carried the day. Planning authorities and the Commission, which work the same way through planners' and inspectors' reports, should check that their decision templates do this clearly. Blue Ireland underlines that points about disturbance, mitigation and in-combination effects are best made, with evidence, to the decision-maker during the process; a court reviewing legality will not readily weigh new expert material against the record. For those preparing Annex IV and Natura assessments, the disputes aired here (the legal meaning of disturbance, the use of effective deterrence ranges, residual effects after mitigation, and how a separation condition between survey vessels avoids cumulative effects) are a useful checklist of what a report should address explicitly.

Kilfenora wastewater: dormant enforcement challenge refused leave

Duffy v Clare County Council [2026] IEHC 725 (https://judgments.courts.ie/judgments/44744) (Irish Water Limited, notice party). High Court (Nolan J), judgment delivered 3 November 2026 (record 2022 493 JR).

Mr Duffy, a Kilfenora resident who has brought several earlier challenges about wastewater in the area, sought leave for judicial review, including mandamus and declarations, over the council's handling of his December 2021 complaints of unauthorised development at the Kilfenora wastewater treatment plant, permitted on appeal in March 2020. He also sought injunctions against a temporary treatment plant and a discharge to groundwater through a swallow hole. The proceedings issued in June 2022 but had not been pursued by him since July 2022. Nolan J refused leave. He found no substantial grounds, as the allegations of bias, failure to investigate under sections 152 and 153 of the 2000 Act and breach of the Groundwater Regulations were "advanced in broad and conclusory terms" without particulars. He also held that it would be an abuse of process to proceed when the same issues could have been pursued in an earlier case, Duffy One, which Mr Duffy had discontinued against the council, and were before the Circuit Court in section 160 proceedings; and that the delay was a further reason to refuse. He wrote that "proceedings once issued, must be pursued with urgency", and noted that the Aarhus costs protection is not absolute, pointing to the court's power under section 50B(3) to award costs where proceedings are frivolous or vexatious or a party has acted unreasonably.

What it means for your assessment

For enforcement officers, the case is a reminder that a section 5 declaration, here confirming that works for the percolation area were development within the terms of the existing permission, can be an important part of the record when complaints are later litigated, and that a written account of how each complaint was investigated is the best answer to a claim of inaction. For residents and community groups, the judgment is a caution rather than a criticism of concern for water quality: a complaint has the best chance in one well-chosen forum, pursued promptly and pleaded with specific facts linked to specific legal errors. The same pleading standard applies to litigants in person as to represented parties.

Further reading

Sweetman v The Environmental Protection Agency [2026] IESC 48 (https://judgments.courts.ie/judgments/44759), Courts Service judgment page, with the court's own judgment summary

Ballycar Green Energy Ltd v An Coimisiún Pleanála [2026] IEHC 726 (https://judgments.courts.ie/judgments/44743)

Ryan v Maritime Area Regulatory Authority [2026] IEHC 731 (https://judgments.courts.ie/judgments/44752) and Blue Ireland Coalition CLG v Maritime Area Regulatory Authority [2026] IEHC 732 (https://judgments.courts.ie/judgments/44753)

Duffy v Clare County Council [2026] IEHC 725 (https://judgments.courts.ie/judgments/44744)

Planner’s Take, 13 November 2026

Zoning more land than the core strategy allows will not build the homes Meath needs

This is an editorial from BPS Planning, issued for discussion only.

There is an understandable frustration in council chambers this autumn. Across the country, elected members are varying their county development plans to zone more land for housing, and many of them feel that the national framework they are asked to follow is the very thing holding them back. That frustration came into the open at last week's meeting of Meath County Council, where councillors urged officials to put forward more land than the core strategy permits, on the basis that no Minister would stand in their way.

The argument has a simple logic. Meath has been given a target of 2,942 homes a year to 2030. Councillors pointed out that the county is well short of that rate, and that landowners and builders have made a large number of rezoning submissions. If the land is there, the reasoning goes, zone it, and let the national bodies say what should come out. One councillor put it bluntly: there is no point telling a homeless family that more houses cannot be built because of a core strategy.

That point deserves a fair hearing. The core strategy was designed in an era when the main concern was too much zoned land in the wrong places, the legacy of the years before 2008 when estates were permitted far from services and many were left unfinished. Housing need today is acute, and the national targets have risen. It is reasonable for councillors to ask whether the figures in their plans still match what the Government expects of them, and to press for a review where they do not.

But the proposal to simply zone beyond the core strategy misreads both the law and the problem. The core strategy is not a guideline that councils may set aside when it is inconvenient. It is a statutory part of the development plan, and the plan must be consistent with the National Planning Framework and the regional strategy. Variations are examined by the Office of the Planning Regulator, which can recommend that the Minister direct a council to remove provisions that are not consistent with national and regional policy. A variation built on the hope that nobody will object is a variation that risks months of delay, and it is housing that would bear the cost.

More importantly, zoning was never the binding constraint in most of our growing towns. Land zoned for housing produces homes only when it is serviced, viable and in the hands of someone willing to build. Water and wastewater capacity, road access, schools and public transport decide whether a field becomes an estate. Zoning a large tract on the edge of Dunboyne, as one councillor suggested, does nothing if the pipes cannot take the load, and it may draw investment away from serviced sites closer to the centre. The same meeting heard that Meath County Council is itself liable for over half a million euro in Residential Zoned Land Tax this year on 32 parcels of its own land. That figure says more about the gap between zoning and building than any core strategy table.

Mayo offers a quieter lesson from the same week. Councillors there tried to add a serviced site at the Quay in Westport to their variation by amending the minutes, after it was left out by oversight. The Chief Executive told them that doing so would legally undermine the entire variation, and that the proper route is a material alteration after public display. Nobody disputed that five houses on a serviced site are worth having. The point was that a plan-making process that skips its own procedures invites challenge, and a successful challenge can unpick far more than a single site.

There is a better path, and it is available now. Councils that believe their housing figures are too low should make that case on the evidence, using the Minister's revised targets, and ask the Regulator and the Department to engage early rather than late. Where land is zoned but stalled, the priority should be the infrastructure and activation measures that make it buildable, together with honest scrutiny of why sites stay idle. Councillors are right to want more homes. They will get them faster through a plan that stands up legally and puts new zoning where services can follow, than through a plan that tests how far the rules can be stretched.

Thursday, 12 November 2026

Planner’s Take, 12 November 2026

Smaller apartments are filling the Digital Hub, and the courts have yet to rule on the standards

This is an editorial from BPS Planning, issued for discussion only.

Within a week of the Government issuing its Design Standards for Apartments as a national planning statement, the first large public scheme to be reshaped by them has appeared. The Land Development Agency's revised plans for the Digital Hub lands off Thomas Street in Dublin 8 now show 716 apartments, up from the 550 proposed in 2022. One extra storey accounts for part of the increase. Most of it comes from smaller homes.

On its face this is the new policy doing exactly what it was designed to do. The standards allow the smallest apartment, a studio, to fall from 37 to 32 square metres, relax the requirements on dual aspect, ceiling heights, storage and private open space, and stop planning authorities from requiring set proportions of larger units. On a constrained, publicly owned inner-city site well served by public transport and close to jobs and colleges, more homes from the same land is a reasonable ambition. The LDA points out that more than a quarter of the apartments will still exceed the minimum sizes, and the scheme brings 14 buildings on Thomas Street back into use, along with industrial heritage such as Vat House 7 and the Watling Warehouse. That is real regeneration on a street that has waited a long time for it.

But the timing deserves attention. The same standards were issued last year as ministerial guidelines, and a challenge to them led the Irish courts to refer questions to the Court of Justice of the European Union. That ruling is still awaited. The Minister chose to put the standards on the footing of a national planning statement under the new planning legislation rather than wait for it. Whatever the merits of the choice, the practical result is that schemes are now being designed, and soon decided, on standards whose legal basis has not been fully tested.

For applicants this matters a great deal. A large application takes months of design, environmental work and consultation, and a permission takes a year or more to lead to a start on site. The Digital Hub scheme is not due to begin construction until 2028. If the European ruling unsettles the standards, the exposure falls on every permission that depends on them, and on the planning authorities and the Commission that applied them. Developers will price that risk, and lenders will ask about it. It would be an unhappy outcome if a measure meant to speed up delivery instead invited a new round of judicial review.

There is also the question of what is being built. The case for smaller units rests on the large number of one and two-person households and on viability, and both arguments have force. Yet a city that builds mainly studios and one-bedroom homes in its core risks repeating an old mistake: inner-city neighbourhoods that people pass through rather than settle in. Dublin 8 is a long-established community of families. The scheme includes only a small number of three-bedroom homes, and those are in the refurbished buildings along Thomas Street. The just-approved second phase at St Teresa's Gardens nearby, with its own-door duplexes, shows that a mix of homes remains achievable on public land.

The counter-argument is serious and should be stated fairly. Households are waiting now. Construction costs are high, and every square metre counts against viability. Generous standards that add cost do not help someone renting a box room in a shared house. Smaller, well-designed homes in the right locations are better than homes that are never built, and the evidence from the pipeline is that too many permissions are not proceeding.

My view is that both things can be true. Compact apartments have a place in a well-served inner city, and the LDA's scheme has much to recommend it. However, the State's own housing delivery body should be setting the benchmark for quality, not simply testing the new minimums. The Commission, when it receives this application, should look closely at the mix of homes, the quality of daylight in single-aspect units, and the communal space that compensates for smaller private rooms. And the Government would do well to say plainly what it will do if the European ruling goes against it. Certainty is the one thing every applicant, council and community needs, and it is the one thing the current approach has not yet provided.

Irish Town Planner Planning News Roundup, 13 November 2026

Here is today's round-up of town planning news from around Ireland, covering the passage of the Short-Term Letting and Tourism Bill through the Dáil, Meath councillors' call to zone more land than the core strategy allows, a Westport site left out of Mayo's development plan variation, 38 homes approved in Portarlington, a revised 35-home scheme in Buncrana, the conversion of the Lough Allen Hotel to apartments, and an unused Tallaght crèche turned into two apartments.

Short-term letting Bill passes the Dáil

The Short-Term Letting and Tourism Bill has passed the Dáil by 83 votes to 71 and now goes to the Seanad. It sets up a national register of short-term lets of up to 21 nights, administered by Fáilte Ireland, while the accompanying national planning statement restricts new short-term lets in towns of more than 20,000 people. Kerry TD Michael Healy-Rae argued that long-established operators would still have to seek retention permission, while the Taoiseach said there is a presumption in favour of permission for those operating for more than seven years and a simplified application process, and Minister for Tourism Peter Burke described it as a straightforward process.

Source: The Irish Times (12 November 2026) (https://www.irishtimes.com/politics/oireachtas/2026/11/12/short-term-lets-bill-passes-dail-as-taoiseach-criticises-healy-rae-scaremongering/)

Meath councillors urge more rezoning despite core strategy limits

Meath councillors have urged planning officials to put forward more land for residential rezoning than the core strategy and National Planning Framework allow, as the council varies its county development plan. Councillors said Meath will struggle to meet its ministerial target of 2,942 homes a year to 2030, and Chief Executive Kieran Kehoe asked them to identify where they want more zoned land. The meeting also heard that the council faces a Residential Zoned Land Tax liability of €546,048 for 2026 on 32 of its own land parcels.

Source: Meath Chronicle (12 November 2026) (https://www.meathchronicle.ie/2026/11/12/the-minister-is-looking-for-300000-houses-by-2030-but-we-havent-a-hope-of-reaching-that-with-the-figures-we-have/)

Westport site to stay out of Mayo plan variation for now

Mayo County Council's Chief Executive, Kevin Kelly, has told councillors that adding land at the Quay in Westport to the county development plan variation by amending the minutes would legally undermine the whole variation. Councillors said the serviced site, where a developer wants to build five houses, had been left out by oversight and remains zoned agricultural. Mr Kelly said the only route is a material alteration after the public display period, with the variation due back before councillors next month.

Source: The Mayo News (11 November 2026) (https://www.mayonews.ie/news/westport-site-to-remain-omitted-following-mayo-council-chiefs-warning-9345469)

38 homes approved at Cooltederry, Portarlington

Laois County Council has granted conditional permission to Garryduff Properties for 38 homes on a 1.128-hectare greenfield site at Cooltederry, Portarlington, accessed through the Lansdowne and Castlelea estates. The site has been the subject of several earlier applications, and this one drew 17 objections citing traffic, loss of green space, density and the unfinished state of the existing estate. Conditions include biodiversity enhancement in the green areas and EV charging for 10 per cent of parking spaces.

Source: Laois Live (12 November 2026) (https://www.ireland-live.ie/midlands/laois-live/laois-housing-estate-approved-after-years-of-planning-battles-9346589)

Revised 35-home scheme approved at Luddan, Buncrana

Donegal County Council has granted George Doherty Construction permission for revised house designs and a modified layout at a 35-home development at Luddan, Buncrana, first approved in 2020, including the replacement of seven partly built houses. The repositioning increases separation distances from existing homes. The 28 conditions include a DMURS-compliant footpath before development starts and Stage 2 and Stage 3 road safety audits.

Source: Donegal Live (12 November 2026) (https://www.donegallive.ie/news/35-buncrana-houses-get-planning-approval-with-seven-homes-to-be-rebuilt-9348314)

Lough Allen Hotel to be converted to 24 apartments

Leitrim County Council has granted permission to convert the 24 hotel apartments at the Lough Allen Hotel in Drumshanbo into residential apartments meeting current standards, with new balconies, ground-floor patios, a lift, bicycle parking and bin storage. The seven conditions include a landscaping scheme, an Uisce Éireann connection agreement and the appointment of a management company before occupation.

Source: Leitrim Observer (12 November 2026) (https://www.leitrimobserver.ie/news/permission-granted-for-leitrim-hotel-to-convert-to-residential-apartments-9346218)

Unused Tallaght crèche to become two apartments

South Dublin County Council has granted a change of use to turn a crèche at Westend Gate, Tallaght, into two two-bedroom apartments of 93 and 104 square metres. The applicant said the 2004 facility had never been occupied by a childcare provider because of its lack of drop-off space and parking, its busy roadside location and existing supply in the area. No extra parking is proposed, given the Luas stop about 320 metres away.

Source: The Echo (12 November 2026) (https://www.echo.ie/two-apartments-approved-for-former-tallaght-creche/)

Wednesday, 11 November 2026

Irish Town Planner Planning News Roundup, 12 November 2026

Here is today's round-up of town planning news from around Ireland, covering the Land Development Agency's revised plans for 716 apartments at the Digital Hub in Dublin 8, an EU push to permit wind and solar farms within six months, 123 homes and a multi-sport pitch approved at St Teresa's Gardens, the Commission's refusal of the Graffy wind farm near Glenties, and a withdrawn application for 40 apartments in Waterford city.

LDA plans 716 apartments for Digital Hub lands in Dublin 8

The Land Development Agency has published revised plans for its Pear Tree Crossing scheme at the Digital Hub off Thomas Street, increasing the number of apartments from 550 to 716 in blocks of up to 13 storeys. The increase comes partly from one extra storey but mostly from smaller apartments permitted under the Government's new Design Standards for Apartments, issued last week as a national planning statement; more than a quarter of the units will still exceed the minimum sizes and just over 40 per cent will be dual aspect. The scheme would reinstate 14 buildings on Thomas Street and reuse industrial heritage buildings including Vat House 7 and Watling Warehouse, with an application to An Coimisiún Pleanála due by the end of the year and construction expected to start in 2028.

Source: The Irish Times (12 November 2026) (https://www.irishtimes.com/ireland/2026/11/12/more-than-700-homes-planned-for-digital-hub-lands/)

EU Grids Package could see wind and solar farms permitted within six months

European Commissioner for Energy Dan Jorgensen has said that standard wind and solar developments, and the cables and grid infrastructure that serve them, could be permitted within six months under the EU Grids Package, with a maximum of two years for complex projects. He said permits can currently take five to ten years, and that negotiations are hoped to conclude before Christmas, during Ireland's presidency of the EU. Minister for Climate Darragh O'Brien has previously said passing the package is a priority for the presidency.

Source: The Irish Times (12 November 2026) (https://www.irishtimes.com/environment/2026/11/12/planning-for-wind-and-solar-farms-could-be-granted-within-six-months-under-new-plans/)

123 homes and multi-sport pitch approved at former St Teresa's Gardens

Dublin city councillors have approved 123 homes, 103 cost rental and 20 social, together with a multi-sport playing pitch and a new public park, on the former St Teresa's Gardens site in Dublin 8. The second phase of the LDA and Dublin City Council's Donore Project includes a 16-storey apartment block and a three-storey block of own-door ground-floor and duplex apartments. Construction is due to start next year, with the pitch to be finished by the end of 2027 and the homes by the end of 2028.

Source: The Irish Times (11 November 2026) (https://www.irishtimes.com/ireland/2026/11/11/new-multi-sport-playing-pitch-and-123-homes-granted-permission-in-dublin-8/)

Commission refuses Graffy wind farm near Glenties over eagle risk

An Coimisiún Pleanála has refused permission for an eight-turbine wind farm at Graffy, near Glenties, Co Donegal, citing a significant collision risk for white-tailed eagles and habitat loss and displacement for golden eagles, both Annex I species. The Commission also found the turbines would be highly obtrusive in an area designated as Especially High Scenic Amenity, and stated that the refusal was consistent with its obligations under the Climate Action and Low Carbon Development Act 2015. The appeal by Cuilfeach Teoranta had been reactivated in 2025 after a successful High Court challenge to the Commission's 2023 decision.

Source: Donegal Live (11 November 2026) (https://www.donegallive.ie/news/an-coimisiun-pleanala-refuses-glenties-wind-farm-citing-eagle-safety-9345265)

Application for 40 apartments behind Tycor estate withdrawn

An application for 40 apartments in five blocks at the rear of The Willows estate in Tycor, Waterford city, has been withdrawn following opposition from local residents. The proposal comprised 24 one-bedroom, five two-bedroom and 11 three-bedroom apartments with 30 parking spaces, and residents had raised concerns about traffic safety, density, residential amenity and missing technical assessments.

Source: The Munster Express (11 November 2026) (https://www.munster-express.ie/developer-withdraws-apartment-block-application/)

Planner’s Take, 11 November 2026

A permission that is never built is not a home: why the planning pipeline needs watching

This is an editorial from BPS Planning, issued for discussion only.

For most of the past decade, the argument about housing in Ireland has been an argument about the planning system. The charges are familiar: too slow, too uncertain, too exposed to legal challenge. Deloitte's latest Crane Survey, reported this morning, offers a useful corrective. It does not say the planning system is the only problem. It says something more uncomfortable: that even the permissions we already have are not reliably turning into homes.

The headline figures are stark. Deloitte expects about 40,000 homes to be completed this year, a 10 per cent rise on 2025 and the highest level since 2008. That is real progress and deserves to be said plainly. But the Government's target is 300,000 homes by the end of 2030, which would leave around 260,000 to be built in four years. On Deloitte's reading, the State is on course to fall short by somewhere between 123,400 and 136,100 homes.

The reasoning behind that estimate matters more than the number. Over the last five years, 182,130 homes have been granted planning permission. Yet Central Bank analysis suggests that between a quarter and almost a third of permissions never commence at all. Apply that lapse rate, and the pipeline shrinks quickly. Add the usual delay between a grant and a first sod being turned, and it becomes clear why the report describes the next 12 to 18 months as critical.

For planners, this should shift the conversation. A grant of permission is often treated, in political debate and in council reports alike, as the finish line. It is not. A permission is an option to build, and options are exercised only when the numbers work: when finance can be raised, when construction costs are matched by achievable prices or rents, when water and wastewater connections are available, and when the developer has the capacity to start. Where any of those conditions fails, the permission sits on a file until it expires.

There is a further caution in the report. Deloitte notes that this year's strong completions owe something to the temporary waiver of development levies introduced in 2024, which requires homes to be completed by 31 December 2026. A deadline of that kind pulls activity forward. When it passes, some of the momentum may pass with it. It would be a mistake to read any dip next year as proof that planning reform has failed.

The counter-arguments deserve a fair hearing. The Government can point to rising completions, and yesterday the Department reported a 57 per cent rise in what it now calls Starter Home Supports, with Cost Rental delivery more than doubling in the first half of the year. Forecasts are not destiny, and the lapse rate drawn from earlier years may not hold in a market with more State involvement through the Land Development Agency, local authorities and approved housing bodies, which do not walk away from permissions in the same way. All of that is true, and the Deloitte figures should be read as a warning rather than a verdict.

But the warning points to practical work. Councils already record commencement notices; that information should be brought together with grant data, regularly and in public, so that everyone can see how many permitted homes are actually under way in each county and why the rest are stalled. Where the obstacle is infrastructure, the answer is targeted investment in water, wastewater and transport, programmed alongside zoning rather than after it. Where the obstacle is viability, the honest response is to say so, and to decide openly whether the State will close the gap through cost rental, affordable purchase or direct delivery.

None of this is an argument for granting less, or for weakening the scrutiny that good decisions require. Ireland needs a steady flow of sound permissions in the right places. It is an argument for measuring the right thing. The number of homes permitted is a measure of the planning system's output; the number of homes started is a measure of whether that output is useful. For as long as a quarter or more of permitted homes are never built, the State is not short of permissions so much as short of the conditions that turn them into front doors.

The next year and a half will show whether the recent rise in completions is a turning point or a peak shaped by a deadline. Planners cannot control interest rates or construction costs, but we can insist on clearer evidence of what happens after the decision is made. That would be a modest reform, and more useful than blaming the system for homes it has already approved.

Tuesday, 10 November 2026

Irish Town Planner Planning News Roundup, 11 November 2026

Here is today's round-up of town planning news from around Ireland, covering a Deloitte warning that the 2030 housing target will be missed by more than 120,000 homes, permission for a 12-turbine wind farm near Bruff, a 57% rise in Starter Home Supports, ten social homes approved in south Finglas, an appeal against seven homes on Drogheda's North Road, and a refusal for a mixed-use building on Arklow's Harbour Road.

Deloitte warns 2030 housing target likely to be missed by more than 120,000 homes

Deloitte's latest Crane Survey says the Government is likely to fall short of its target of 300,000 new homes by 2030 by between 123,400 and 136,100 homes, largely because planning permissions are "not keeping pace". While 182,130 homes were granted permission over the last five years, Central Bank data indicate that 25 to 32 per cent of permissions never commence, and the report estimates 40,000 completions this year, a 10 per cent rise on 2025. Deloitte says the next 12 to 18 months are critical and notes that recent completions have been driven in part by the development levy waiver, which requires construction to be completed by 31 December 2026.

Source: The Irish Times (11 November 2026) (https://www.irishtimes.com/business/2026/11/11/government-likely-to-miss-2030-housing-target-by-more-than-120000-units/)

Commission grants 12-turbine Ballinlee wind farm near Bruff

An Coimisiún Pleanála has granted permission for Ballinlee Green Energy's 12-turbine wind farm near Bruff, Co Limerick, with a generating capacity of about 53.6MW and an expected 35-year operating life, despite 309 objecting submissions citing noise, flicker and the 179 homes within 1km of the site. The inspectors' 500-page report found no evidence of health-related effects from wind turbines, and noted that night-time noise would exceed the Limerick County Development Plan limit but fall within the 2006 national guidelines. The scheme was reduced from 17 turbines to protect whooper swans feeding near Lough Gur, and a local action group is to meet this week to discuss challenging the decision.

Source: Irish Examiner (10 November 2026) (https://www.irishexaminer.com/news/munster/arid-41935797.html)

Starter Home Supports up 57% in first half of 2026, Department says

Minister for Housing James Browne announced that 4,699 Starter Home Supports were delivered in the first six months of 2026, up 57% on the 2,980 in the same period last year. The term covers the Starter Home Purchase Scheme (565 homes), Cost Rental (1,399 homes, more than double last year's figure), the First Home Scheme (996 supports) and the Vacant Property Refurbishment Grant (1,739 grants). The opposition accused the Government of repackaging the figures and described them as "woefully inadequate".

Source: Department of Housing (10 November 2026) (https://www.gov.ie/en/department-of-housing-local-government-and-heritage/press-releases/57-rise-in-starter-home-supports-delivered-in-first-half-of-2026-minister-browne/); TheJournal.ie (10 November 2026) (https://www.thejournal.ie/housing-figures-spin-7221740-Nov2026/)

Ten own-door social homes approved for long-neglected Finglas site

Dublin City Council has approved ten social homes on a 0.3-hectare former play area at Berryfield Drive and Valeview Gardens in south Finglas, a site a council report described as a focus for vandalism and anti-social behaviour. The two-storey, U-shaped scheme has two terraces of six two-bedroom houses with four one-bedroom apartments, all with their own front doors, and Berryfield Drive will be reconfigured into two cul-de-sacs. The works include a new vehicular entrance from Cardiffsbridge Road, relocation of a bus stop, sustainable drainage and upgrades to the Valeview Gardens open space, close to the proposed St Helena's stop on the Luas Green Line extension.

Source: Dublin Live (10 November 2026) (https://www.dublinlive.ie/news/dublin-news/ten-new-social-homes-approved-34890549)

Third-party appeal against seven homes on Drogheda's North Road

Louth County Council granted permission to James McKevitt and Keith O'Leary for seven houses at Nos. 47 and 50 North Road, Drogheda, on a site that includes a protected structure. The scheme comprises four semi-detached three-bedroom houses and three terraced four-bedroom houses, with the demolition of two outbuildings, a new internal road, parking and open space. A local resident has lodged a third-party appeal with An Coimisiún Pleanála, which is due to decide it by 11 March 2027.

Source: Irish Independent (11 November 2026) (https://www.independent.ie/county/louth/appeal-lodged-against-seven-home-north-road-development-in-drogheda/a/164210477.html)

Arklow mixed-use scheme refused over overshadowing and pedestrian safety

Wicklow County Council has refused permission for a new mixed-use building at 22-25 Harbour Road, Arklow, citing concerns about overshadowing of neighbouring properties and pedestrian safety. The proposal would have replaced an existing commercial unit with two ground-floor commercial units and two two-bedroom apartments.

Source: Irish Independent (11 November 2026) (https://www.independent.ie/county/wicklow/mixed-use-wicklow-development-refused-planning-over-impact-on-neighbouring-homes/a/164020177.html)

Monday, 9 November 2026

Planner’s Take, 10 November 2026

Cork's North Main Street shows how slowly dereliction is resolved, even when councils use their powers

This is an editorial from BPS Planning, issued for discussion only.

There is a particular kind of failure that no single decision causes. Work was due to begin last night on taking down Nos. 62 to 65 North Main Street in Cork, a terrace that has stood empty and decaying for more than a decade. The council is acting on an engineers' report that found loose and missing masonry, rotten embedded timbers, cracking and displacement, and corrosion in the temporary system holding up the retained façades. The engineers described an immediate public-safety concern and a credible risk of partial collapse. On that advice, demolition is plainly the responsible course. The harder question is how it came to this.

The chronology is worth setting out. The four buildings were entered on the derelict sites register in December 2015. In June 2019, No. 63 partially collapsed, and the council stepped in with emergency works, removing the rear structures of Nos. 63 and 64 and installing a steel frame to hold up the street front. It then moved to acquire all four properties compulsorily, and An Bord Pleanála confirmed the acquisition, finding each structure to be in a ruinous and dangerous condition. The properties vested in the council in 2022. A tender for development proposals was launched in May of this year and has now been ended because of the latest engineering advice. Eleven years after registration, the site is about to become a cleared plot, with no developer in place.

This is not a story of simple inaction. The council used the tools the Derelict Sites Act 1990 gives it: registration, emergency works and compulsory acquisition. Each step was lawful and, by the standards of the Irish system, reasonably pursued. That is what makes the case instructive. If a city council that does what the legislation asks still ends up demolishing a terrace in one of its oldest streets more than a decade later, the problem lies less with any one official than with the pace and sequencing of the process itself.

For practice, three lessons stand out. The first is that time is not neutral for derelict buildings. Every winter of water getting into old masonry and timber narrows the options. The temporary steel frame installed in 2019 was a holding measure, and holding measures corrode. A façade that might have been retained in 2016 or 2019 may not be safe to keep in 2026. The question of what to do with a site has to be answered while there is still a building worth saving.

The second is that acquisition is not the same as regeneration. Vesting the properties in the council in 2022 solved the ownership problem, but it did not supply a scheme, a funder or a builder. A tender launched almost three years after vesting suggests that the end use had not been settled when the acquisition began. Councils pursuing derelict sites should, where they can, have a realistic redevelopment route worked out in parallel with the legal process, whether that means their own housing programme, an approved housing body, a State agency or a private partner.

The third concerns the wider city. Derelict buildings on a main street are not only a private loss. They depress neighbouring property, deter investment and send a signal about how a place is cared for. North Main Street was the subject of an anti-dereliction protest last year, a reminder that the cost is felt well beyond the four addresses concerned.

There are fair counter-arguments. Compulsory acquisition interferes with constitutionally protected property rights, and it is right that it should be subject to proper procedure and independent confirmation. Old buildings in poor condition can be genuinely difficult and costly to save, and no council can be expected to underwrite every one. And it may be said that a cleared, publicly owned site in a city centre is not a bad position from which to start again.

All of that is true. But it is not an argument for accepting an eleven-year cycle as normal. The legal powers to tackle dereliction already exist, including the derelict sites levy and compulsory acquisition. What is too often missing is the speed, resourcing and forward planning that turn those powers into new homes and active ground floors.

The test now is what follows demolition. The council says it remains fully committed to securing the redevelopment of this key city centre site. A clear timetable, a defined end use and a funding route, published soon, would show that the lesson has been learned. A fenced-off gap on North Main Street for another decade would show that it has not.

Irish Town Planner Planning News Roundup, 10 November 2026

Here is today's round-up of town planning news from around Ireland, covering a 2028 construction start for the Galway city ring road and the end of the challenge to Galway Harbour's extension, leave for a judicial review of paid parking at Blanchardstown, demolition of derelict buildings on Cork's North Main Street, a call for a national self-build pathway, plans for 69 homes in Falcarragh, and permission for a machinery auction centre in Portlaoise.

Galway ring road works expected in 2028 as harbour extension challenge is dropped

Construction of the N6 Galway City Ring Road is expected to begin in the second quarter of 2028, Galway City Council's Director of Services Derek Pender told a council meeting, with a construction tender envisaged for mid to late 2027 and enabling works, such as fencing and the relocation of utilities, highly probable next year. Separately, active travel campaigner Shane Foran has withdrawn his High Court challenge to An Coimisiún Pleanála's approval of the Galway Harbour extension, after the city council and Galway Harbour Company agreed to examine better cycling links on Lough Atalia Road and to commission feasibility studies on cycling routes through the harbour lands. Councillors were told the agreements showed the value of dialogue in avoiding costly legal challenges, while concerns were raised about offers to homeowners whose properties are subject to compulsory purchase orders along the ring road route.

Source: RTÉ News (9 November 2026) (https://www.rte.ie/news/regional/2026/1109/1598579-galway-ring-road/); The Irish Times (9 November 2026) (https://www.irishtimes.com/ireland/2026/11/09/galway-man-drops-challenge-to-harbour-expansion-after-securing-cycling-route-commitments/)

TD granted leave for judicial review of Blanchardstown paid parking approval

Ruth Coppinger TD has been granted leave by the High Court to seek a judicial review of An Coimisiún Pleanála's September decision to permit a paid parking barrier system at Blanchardstown Town Centre. Her counsel argued that insufficient consideration had been given to the development plan objectives for Major Town Centre zoning, the lack of local transport links, social inclusion and the net loss of 97 trees. The Commission's inspector had found that controlled parking could reasonably be regarded as a way of managing demand for car travel and parking in an established Major Town Centre.

Source: TheJournal.ie (9 November 2026) (https://www.thejournal.ie/ruth-coppinger-judicial-review-blanchardstown-shopping-centre-parking-charges-7220858-Nov2026/)

Cork City Council to demolish derelict terrace on North Main Street

Cork City Council is to demolish Nos. 62 to 65 North Main Street, a long-derelict terrace, after consultant engineers warned that the buildings and retained façades posed an immediate public-safety concern, with a credible risk of partial collapse. The buildings were entered on the derelict sites register in December 2015, acquired by compulsory purchase and vested in the council in 2022, and a tender for development proposals begun in May has now been terminated. Work began on 9 November and is expected to take up to eight weeks, with a footpath closure and the temporary loss of six parking spaces; the council says it remains committed to the site's redevelopment.

Source: Irish Examiner (9 November 2026) (https://www.irishexaminer.com/property/developmentconstruction/arid-41935287.html)

Oireachtas housing committee to hear call for a national self-build pathway

Harrison Gardner, presenter of RTÉ's Build Your Own Home, is to tell the Oireachtas Joint Committee on Housing, Local Government and Heritage today that the State should fund hands-on training for self-builders through Education and Training Boards, local authorities and community groups. He will ask the committee to recommend a national self-build pathway in the Government's housing plan, with a register in every council of people and groups who want to build their own homes. The meeting, on sustainable methods of construction and issues in the construction sector, will also hear from the Irish Green Building Council and the Construction Industry Federation.

Source: TheJournal.ie (10 November 2026) (https://www.thejournal.ie/harrison-gardner-self-build-7220842-Nov2026/)

Plans lodged for 69 homes, mostly social, at Falcarragh

B&E Hone Construction Ltd has applied to Donegal County Council for 69 homes at Radharc Ná Trá, Falcarragh, comprising 55 social homes and 14 private houses. The mix is 49 two-bed homes, seven three-bed, twelve four-bed and one five-bed group home. Permission is also sought for the continued use of an existing vehicular entrance and access road built in connection with an earlier development.

Source: Donegal Daily (9 November 2026) (https://www.donegaldaily.com/lead-stories/plans-submitted-for-new-69-house-estate-in-west-donegal-657436)

Machinery auction centre granted in Portlaoise enterprise park

Laois County Council has granted Tamar Selby Ltd, a subsidiary of the Euro Auctions Group, permission with 23 conditions for a plant machinery auction facility at the council's National Enterprise Park at Knockmay, Portlaoise. The scheme includes a 2,178 sq m showroom, auction arena and office building, a 3,389 sq m workshop building, machinery storage yards, parking and a nature-based surface water management system. The facility is expected to employ 54 people and hold 36 auctions a year; the council had sought further information on operating hours, parking, lighting, a road safety audit and the choice of location.

Source: Laois Live (9 November 2026) (https://www.ireland-live.ie/midlands/laois-live/plant-machinery-auctioneering-company-gets-green-light-for-huge-outlet-in-portlaoise-9340415)

Sunday, 8 November 2026

Irish Town Planner Planning News Roundup, 9 November 2026

Here is today's round-up of town planning news from around Ireland, covering the stalled State design manual for medium-density, own-door housing, Department of Finance concerns about debt at approved housing bodies, permission for 24 homes at Lismore, staff accommodation approved at Rosapenna, retention permission for a Falcarragh beer garden, and research on strengthening Irish timber for house building.

State design manual for 'Stoneybatter-style' housing remains unfinished

A design manual intended to help developers and planners apply the 2024 compact settlement guidelines, and to deliver own-door, medium-density housing where apartments are not viable, remains unfinished despite the Department of Housing telling local authorities, An Coimisiún Pleanála and the Office of the Planning Regulator in January 2024 that it would be published that spring. Tony Reddy, chair of Property Industry Ireland, says he understands the work has stalled and that only about a month of work is needed to complete it; the Department says work is ongoing "having regard to Government priorities and available resources" and would not give a completion date. The manual is being prepared with the RIAI, Irish and UK planning professionals, local authorities and the National Town Centre First Office; the RIAI has said low-rise schemes of about 30 to 80 own-door homes per hectare could foster Ranelagh and Stoneybatter-style neighbourhoods.

Source: The Irish Times (9 November 2026) (https://www.irishtimes.com/business/2026/11/09/state-manual-to-support-stoneybatter-style-housing-as-alternative-to-apartments-unfinished/)

Department of Finance raises concerns over debt at approved housing bodies

The most senior official at the Department of Finance, John Hogan, has raised concerns with his Department of Housing counterpart, Graham Doyle, about the State's growing exposure to debt at approved housing bodies, after the housing body Circle stopped work on two construction projects in Dublin. In a letter during the summer, he said that with "a live case with potential system implications", the absence of detailed information was a matter of concern. Circle is in talks with Dublin City Council and Fingal County Council about the future of its projects at Marrowbone Lane and Santry; the sector owned or managed almost 77,000 homes in 2025, with another 22,000 planned in the years to 2028.

Source: The Irish Times (9 November 2026) (https://www.irishtimes.com/ireland/2026/11/09/top-housing-officials-worried-about-billions-of-euro-in-debt-racked-up-by-housing-bodies/)

24 homes granted at Railway Gardens, Lismore

Waterford City and County Council has granted Horizon Tip Limited permission, with 22 conditions, for 24 homes at Railway Gardens, Station Road, Lismore: ten semi-detached two-storey houses, one detached bungalow and 13 terraced houses. Existing house bases at Nos. 30 to 35 and No. 37 will be demolished, and the scheme includes a service road, footpaths, public lighting, a two-metre boundary wall and works to open space and foul water services in the adjoining estate. The application was lodged on 13 November 2025 and permission was granted on 4 November.

Source: Waterford Live (8 November 2026) (https://www.waterfordlive.ie/news/planning-permission-granted-for-new-housing-development-in-waterford-9332252)

Rosapenna granted staff accommodation as an 'operational necessity'

Donegal County Council has granted Rosapenna Hotel (1962) Ltd permission for a single-storey building providing ancillary staff accommodation, with eight bedrooms and communal living space, at the golf resort near Downings. The applicant's architect said the resort has to recruit staff from abroad because of a local labour shortage and currently buys or rents ordinary homes in Downings to house them, and argued that dedicated accommodation would free that housing for permanent residents; local councillor Ciaran Brogan supported the application. The permission carries nine conditions, including a development contribution of €3,348.

Source: Donegal Live (6 November 2026) (https://www.donegallive.ie/news/top-donegal-golf-resort-obtains-planning-for-operational-necessity-9335899)

Retention permission for Falcarragh beer garden

Donegal County Council has granted retention permission for a beer garden at The Corner Bar in Falcarragh, described in the application as an unauthorised development ancillary to the main bar, including single-storey structures and a timber-screened fence along the rear boundary. Permission was also sought for picnic tables and benches on the footpath. The grant carries five conditions, including a development contribution of €1,471.37.

Source: Donegal Live (7 November 2026) (https://www.donegallive.ie/news/west-donegal-pub-obtains-planning-permission-to-keep-beer-garden-9336141)

Analysis: could strengthened Irish timber help deliver homes?

In an analysis piece, Professor Michael Morris of the AMBER research centre at Trinity College Dublin notes that fewer than a quarter of homes built in Ireland are timber frame, about half the rate elsewhere in the developed world, and that fast-grown Irish Sitka spruce is generally too low in density for external or load-bearing uses. His team is developing methods to remove and replace lignin so that Irish wood can be compressed into a much stronger material, and he argues this could support a domestic timber construction economy, since about 80% of home-grown timber is currently exported.

Source: RTÉ Brainstorm (8 November 2026) (https://www.rte.ie/brainstorm/2026/1108/1543629-timber-building-ireland-housing-futureville/)

Ireland’s apartment standards: what has changed, and what has not

This is an editorial from BPS Planning, issued for discussion only.

On 4 November 2026 the Minister for Housing, James Browne, and the Minister of State for Local Government and Planning, John Cummins, issued the Planning Design Standards for Apartments as a National Planning Statement under section 25 of the Planning and Development Act 2024. It is easy to read this as a new set of rules, but there have been two separate events. The substantive cuts and relaxations to apartment design standards were made in July 2025. What changed this month is the legal vehicle carrying those standards, and the point in the process at which they bite.

What happened in July 2025

The Design Standards for Apartments, Guidelines for Planning Authorities were issued on 8 July 2025 under section 28 of the Planning and Development Act 2000. They replaced the Sustainable Urban Housing guidelines last updated in December 2022, with a July 2023 amendment on Build-to-Rent transition. The stated aim was to protect quality while improving the viability of apartment delivery, long identified by the Department as a weak point in housing supply.

The changes were real ones. The minimum studio fell from 37 square metres to 32, partly, the Department said, because the old studio was only 8 square metres smaller than a one-bedroom unit.

A new unit type was added: a three-bedroom, four-person apartment of 76 square metres. The full set of minimum floor areas is now: studio 32 square metres; one bedroom (two persons) 45; two bedroom (three persons) 63; two bedroom (four persons) 73; three bedroom (four persons) 76; and three bedroom (five persons) 90. Development plans may not set higher minimums.

Controls on unit mix were removed. Under the 2022 guidelines, a scheme could include up to 50 per cent one-bedroom or studio units, with studios limited to between 20 and 25 per cent of the total, and two-bedroom, three-person units were capped at 10 per cent of a private development. Since 2025 there has been no minimum or maximum for any bedroom number, and development plans cannot restrict mix, except for social housing, Part V housing and housing for older persons, where a mix may be required, for example on foot of a Housing Need and Demand Assessment.

The dual aspect requirement was reduced. The old position was a minimum of 33 per cent dual aspect units in more central and accessible locations and generally 50 per cent in suburban or intermediate locations. That became a single minimum of 25 per cent, with an emphasis on the larger units being the dual aspect ones where feasible. For refurbishment schemes on sites of any size and urban infill sites of up to 0.25 hectares, the planning authority may accept less, case by case, subject to overall design quality. The standard concerns the aspect of units; it is not a rule about the number of windows.

The cap of 12 apartments per floor per core was removed, and plans may no longer set any units-per-core requirement. That is a planning change only: accessibility and fire safety under the Building Regulations still govern cores.

The share of units that must be larger than the minimum was cut. The 2022 guidelines required the majority of apartments in a scheme of 10 or more units to exceed the minimum floor area by at least 10 per cent. In 2025 this became at least 25 per cent.

Finally, a planning authority may accept reduced provision of balconies where high quality, usable communal open space is provided and the amenity value of a balcony would be negligible, for example on units facing major sources of noise and air pollution, or on taller façades exposed to high wind. Even then, the number of units without direct access to private amenity space should not exceed 50 per cent. This is a discretion, not an entitlement to omit balconies.

What the November 2026 statement changes

The new National Planning Statement carries those standards forward with the same numbers. What has changed is their legal footing.

The 2025 document contained Specific Planning Policy Requirements under section 28 of the 2000 Act. The new statement is in two parts. Its eight National Planning Policies and Measures, NPPM 1 to NPPM 8, cover apartment mix, floor areas, dual aspect, ground floor ceiling heights, lift and stair cores, communal, community and cultural facilities, co-living and student accommodation. Regional strategies and development plans must be "materially consistent" with these. The remainder is National Planning Policy Guidance, which plans must "take due account of". That includes the recommended storage, amenity space and room dimension tables. A recommended minimum in an appendix should not be treated as if it were a measure.

Within two months, each planning authority and regional assembly must report to the Office of the Planning Regulator on whether its plan is materially consistent with the measures, and set out how any inconsistency will be removed.

There is one notable softening in wording. The 2025 guidelines said at least 25 per cent of units "shall" exceed the minimum floor area by 10 per cent. The statement says they "should". The expectation does not apply to schemes of fewer than ten units, to refurbishment schemes, or to urban infill on sites up to 0.25 hectares, and for schemes of 10 to 49 units it may be reduced or removed case by case.

Timing: decision date, not lodgement date

The most practical change concerns which applications are caught. In July 2025, Departmental Circular NSP 04/2025 said the 2025 guidelines applied to applications submitted from 9 July 2025, and that files already in the system would be decided under the earlier guidelines. The new statement takes the opposite approach. It applies to any application for planning permission, and to any appeal or direct application to An Coimisiún Pleanála, determined after 4 November 2026. A scheme lodged in September and still awaiting a decision is therefore assessed against the statement.

How the statement will interact with development plans once Part 4 of the 2024 Act commences is untested. Until plans are brought into line, it is prudent to identify any conflicting local standard rather than assume it falls away.

What has not changed

A good deal has been retained. The minimum ground floor ceiling height remains 2.7 metres, and plans may not require more. Above ground floor the statement refers to the 2.4 metres generally suggested in Technical Guidance Document F. For refurbishment and small urban infill schemes, the 2.7 metre figure may be relaxed case by case.

The recommended storage and amenity space figures are unchanged: storage of 3, 3, 5, 6, 6 and 9 square metres across the six unit types, from studio to the five-person three-bed, and private amenity space of 4, 5, 6, 7, 7 and 9 square metres, with communal amenity space recommended at the same figures. These sit in the guidance, with discretion for refurbishment and infill schemes.

Car and bicycle parking are not set by the statement. Both are referred to the Sustainable Residential Development and Compact Settlement Guidelines 2024, with car parking to be minimised, substantially reduced or wholly eliminated in well-served locations.

Communal, community and cultural facilities may only be required in locations identified in the development plan, not on a blanket threshold basis. The presumption against co-living continues unless a planning authority has identified specific demand through a Housing Need and Demand Assessment. Student accommodation now has its own chapter and measure, but the standards themselves, including study bedrooms of 8 square metres without an en-suite and 11.5 square metres with one, were already in the 2025 guidelines.

The legal challenge

The 2025 guidelines were the subject of judicial review proceedings, and questions were referred to the Court of Justice of the European Union. Those proceedings are ongoing. The Ministers have said the statement is issued "strictly without prejudice" to them, and it was accompanied by a precautionary strategic environmental assessment. Issuing the statement does not end the case or answer the questions referred.

What this means in practice

For applicants, check the decision date of any live file. Applications should show plainly how each measure is met: unit mix, the area of every unit, which units exceed the minimum by 10 per cent, aspect, storage and amenity space. Where the design relies on the discretion available for refurbishment, small infill sites or reduced balconies, the design case should be made rather than assumed, because these are judgements for the planning authority and An Coimisiún Pleanála, not automatic entitlements.

For planning authorities, the immediate job is the consistency report to the Office of the Planning Regulator.

Smaller minimums are minimums, not targets. Viability is a legitimate aim, but lower standards do not guarantee lower prices for buyers or renters, and the homes being permitted now will be lived in for decades. The schemes that serve their residents well will be those that use the new flexibility carefully: larger units where families are likely to live, real daylight, generous storage, and communal space that people actually use.

Sources

Planning Design Standards for Apartments National Planning Statement, 2026 (final, PDF) (https://assets.gov.ie/static/documents/06ccfd53/1._Planning_Design_Standards_for_Apartments_NPS_Final.pdf)

Design Standards for Apartments, Guidelines for Planning Authorities, 2025 (PDF) (https://assets.gov.ie/static/documents/Planning_Design_Standards_for_Apartments_080725_FINAL.pdf)

Circular NSP 04/2025, transitional arrangements (PDF) (https://assets.gov.ie/static/documents/Apartment_Guidelines_Circular_NSP_04.pdf)

Sustainable Urban Housing (Design Standards for New Apartments, 2022 (PDF): https://assets.gov.ie/static/documents/sustainable-urban-housing-design-standards-for-new-apartments-guidelines-for-planning-.pdf)

Department of Housing press release, 4 November 2026 (https://www.gov.ie/en/department-of-housing-local-government-and-heritage/press-releases/national-planning-statement-on-apartment-standards-issued-by-minister-browne-and-minister-of-state-john-cummins/)

Planner’s Take, 8 November 2026

Wicklow’s turn: making national housing policy work on the ground

This is an editorial from BPS Planning, issued for discussion only.

It is Wicklow’s turn now. Changes in national housing policy are working their way into the county’s development plan, and the difficult business of translating national ambition into places where people can live has arrived at the council’s door. This is not a county inventing a problem for itself. It is a local authority being asked to make a national response to the housing crisis work on particular sites, in particular towns, with infrastructure that cannot be conjured into existence by a vote.

I should declare my interest. Wicklow is my home county, and BPS Planning, my firm, has made submissions to this process. We work throughout Ireland. That gives this debate a particular personal and professional importance for me, but the underlying difficulty is national, not a Wicklow exception.

Variation No. 7 is intended to bring the County Development Plan into line with revised government housing targets, including 2,068 homes a year up to 2034. The process has attracted more than 860 submissions. Behind those numbers are households waiting for homes, communities considering what growth will mean, and a council trying to reconcile demands that do not arrive with matching resources or timetables.

The agency responses show the difficulty. Uisce Éireann has identified significant water and wastewater upgrades needed for several proposed residential lands, some potentially beyond the current plan’s lifetime. The National Transport Authority has questioned public transport provision in some growth areas. Transport Infrastructure Ireland has raised concerns about proposed residential zoning beside the N81 in Blessington. These are practical questions about delivery, not evidence that Wicklow is unwilling to accommodate homes.

The everyday transport picture is familiar to me: trains are full and there are not enough buses. Add new homes without improving those choices and the pressure will be felt immediately by the people already travelling and those moving in. Housing and infrastructure must go hand in hand everywhere. Water, wastewater, rail and buses are not optional extras to be considered after the keys have been handed over.

It is a very tough job for the council. Who would envy having to reconcile urgent housing need, national targets, local concerns and infrastructure decisions substantially dependent on other bodies? Councillors and officials cannot build railway capacity or commission a treatment plant merely by adopting a zoning. Holding them responsible for the entire chain is convenient for national debate, but it is not an honest account of how delivery works.

Yet the answer cannot be to wait until every difficulty has disappeared. The shortage of homes is urgent. Infrastructure planning and land-use planning need to advance together, with credible sequencing rather than a choice between speculative promises and indefinite postponement. A warning about capacity should trigger decisions about investment, timing and alternatives, not become a permanent reason for leaving people without homes.

My recent Ballymun essay returned to a lesson that belongs in this discussion: homes alone do not make supported neighbourhoods. Services, connections, management and sustained investment shape what living in a place actually means. That is not a comparison between Wicklow and Ballymun’s history. It is a basic responsibility wherever we build, whether on a large urban estate or beside a growing county town.

We must get better at forward planning nationally. Revised housing expectations should be accompanied by coordinated, funded programmes for the infrastructure they imply. The question should be which agency will deliver what, with what funding and in what sequence, not simply which council will absorb the additional housing number. Schools, healthcare, energy and community facilities also belong in that conversation. National policy has to follow the housing target all the way to the ordinary working day of the household expected to live there.

Wicklow’s task is to turn this round of national policy change into deliverable communities. Its council deserves scrutiny, but also practical support, realistic commitments and partners able to deliver. The county cannot be expected to close a national coordination gap on its own. If this is Wicklow’s turn to plan for more homes, it must also be the State’s turn to help make those homes work.